The procedure and method of TBM quickly driving across fracture zone are presented in this paper.
主要論述了TBM(隧道掘進(jìn)機(jī))快速通過(guò)斷層破碎帶的方法和步驟.
互聯(lián)網(wǎng)
The cause of deviation of driving with TBM in Qinling Tunnel is the difficult geological condition.
由于秦嶺隧道部分地段地質(zhì)方面的原因,使TBM在掘進(jìn)中發(fā)生了偏離現(xiàn)象.
互聯(lián)網(wǎng)
The rational disposition of anti - TBM units is a precondition and a key factor to intercept TBM.
合理部署 反 導(dǎo)兵器是攔截TBM的前提和關(guān)鍵.
互聯(lián)網(wǎng)
Chinese font LCD Module User's Guide TBM 12864 - 12 , introduced in detail.
中文字庫(kù)液晶顯示模塊使用手冊(cè)TBM12864 -12, 介紹詳細(xì).
互聯(lián)網(wǎng)
The techniques to advance the penetration probalility of TBM are given model by using simulation program.
通過(guò)仿真計(jì)算分析,提出了提高彈道突防能力的技術(shù).
互聯(lián)網(wǎng)
This paper expounds in detail the tunneling technical points and quality control methods of TBM.
詳細(xì)闡述了全斷面隧洞掘進(jìn)機(jī)掘進(jìn)技術(shù)要點(diǎn)和質(zhì)量控制方法.
互聯(lián)網(wǎng)
There are mainly two kinds of roadheader: Tunnelling Boom Machine ( TBM ) and partial - size tunneling machine.
掘進(jìn)機(jī)按照對(duì)于巷道斷面的作用方式可劃分為兩種: 全斷面 掘進(jìn) 機(jī)和部分 斷面 掘進(jìn)機(jī).
互聯(lián)網(wǎng)